top of page
13-Mile Road Survey for Pre & Post-Condition Assessment
13-mi Road survey
.png)
Client
TG Engineers, PUI and DPW
Project Type
Inspection & Visual Mapping
Location
Various, Guam
Project Overview
To assess the pre- and post-conditions of a 13-mile roadway impacted by the transport of heavy equipment for an energy project in Guam, 2cofly partnered with TG Engineers to conduct a comprehensive drone-based survey.
Using high-resolution photogrammetry, 2cofly captured detailed aerial imagery of the entire route, while TG Engineers provided over 60 ground control points (GCPs) to ensure survey-grade accuracy. This collaboration enabled stakeholders to document the road conditions before and after the equipment transport, ensuring accountability and facilitating any necessary repairs.
The Challenge
Transporting heavy equipment over long distances
_gold-black.png)